A bathroom planned for daily use
Layout before fitting
We check pipes, drainage and room space before fixing the new positions.
Coordinated finishes
We manage plumbing, sanitaryware and wall finishes as one planned job.
Practical material choices
We help you choose surfaces and fittings that suit cleaning and regular use.
A complete bathroom, not a collection of jobs
A bathroom refurbishment works better when the pipes, fittings and finished surfaces are planned together. We assess the room layout, supply and waste positions, ventilation and available storage before anything is removed. We also discuss who will use the room, including any need for easier access. Changing from a bath to a shower, moving sanitaryware or adding storage can alter both the plumbing and preparation. By resolving those details early, we can create a practical layout and avoid awkward fittings squeezed into the wrong places.


Clear stages from strip-out to testing
We remove the old suite, complete first-fix plumbing and prepare the room for its new fittings. Sanitaryware, tiling, or shower boards then go in before sealing and functional checks. A typical full programme takes around ten working days. The stated average project range is 7,000 to 10,000 pounds, with room condition, layout changes and finish choices affecting the final quotation. Keeping the plumbing and finishes with one team also reduces the hand-offs that can slow a major bathroom job.
Frequently asked questions
How long does a full bathroom refurbishment take?
A typical full programme is around ten working days. The exact schedule depends on the room condition, plumbing changes and chosen finishes. We explain the expected sequence after assessing the bathroom and the agreed specification.
What changes the cost of a new bathroom?
Layout alterations, damaged backgrounds, sanitaryware choice and the amount of tiling or panelling all influence the price. The stated average range is 7,000 to 10,000 pounds, with a quotation prepared for your room.
Can we change a bath into a walk-in shower?
We can assess the available space, drainage position, floor construction and access needs. That check helps us decide whether an open shower, screened arrangement or another layout will control water and use the room well.