Warm floors are planned before they are covered
Heat loss calculated
We design output around the room rather than relying on a standard layout.
Floor height considered
We explain how the installation method affects the final floor build-up.
Tested before covering
We pressure-test the pipework before the finished floor hides the system.
Even heat without giving up wall space
Underfloor heating spreads warmth across the floor and removes the need for bulky radiators on usable walls. We design and install water-based systems for renovations, extensions, new builds, kitchens, bathrooms and whole homes. Room heat loss, insulation and floor covering all affect the required output. We also consider zoning, controls and the heat source. This design stage matters because closely spaced pipe alone cannot make up for poor insulation, unsuitable floor build-up or a system temperature that does not match the property.


Match the system to the floor construction
Solid floors, suspended floors and retrofit projects need different installation approaches. We assess available depth and explain how the chosen method may affect finished floor height. The pipework is pressure-tested before it is covered, then the system is commissioned, and controls are set up. Heat should be introduced gradually to protect floor finishes and allow the build-up to respond properly. Efficient operation depends on design and control, so potential energy savings cannot be treated as a fixed promise.
Frequently asked questions
Can underfloor heating work with a heat pump?
Yes, it can suit the lower flow temperatures used by many heat pump systems. We still need to assess room heat loss, pipe layout, floor build-up and controls to confirm the required output.
Will the installation raise the finished floor?
It can. The amount depends on whether the floor is solid, suspended or being retrofitted. We assess available depth and explain the build-up before you commit to finishes, doors or adjoining floor levels.
When can the system be switched on after fitting?
That depends on the screed, adhesive and floor finish. Heat normally needs to be introduced gradually after the required curing period. We explain the commissioning and warm-up process for the chosen build-up.

