Hot water is planned as a complete system
Flow checked first
We assess the incoming main before recommending a mains-pressure cylinder.
Demand properly considered
We size the arrangement around how many outlets the household may use.
Controls explained
We commission the system and show you how its controls should operate.
Main-pressure hot water for higher demand
An unvented hot water cylinder stores hot water and supplies it using incoming mains pressure. It can suit homes where several outlets may be used close together, but the cylinder cannot improve a weak incoming supply by itself. We check flow, pressure, household demand and the available installation space first. We also consider the boiler or other heat source and the pipe routes serving taps and showers. That assessment tells us whether an unvented arrangement is suitable for the property.


Safety controls and discharge are planned properly
Installation requires correctly sized pipework, suitable safety controls and a compliant discharge arrangement. We plan the cylinder position, fit the agreed equipment and commission the completed system. Hot water will need to be interrupted during part of the work, so we explain the sequence beforehand. Compared with a vented cylinder, an unvented unit removes the need for a cold-water storage tank. Compared with a combi boiler, it stores a volume of hot water, which can better suit higher simultaneous demand.
Frequently asked questions
Will an unvented cylinder improve poor water pressure?
It relies on the incoming mains supply, so it cannot deliver strong performance with inadequate flow or pressure. We test the supply and consider the pipework before advising whether the system is suitable.
How is it different from a combi boiler?
An unvented cylinder stores hot water for use at outlets, while a combi heats water as it is required. Stored water can support higher demand, but it needs cylinder space and planned reheating.
Where can the new cylinder be installed?
The position needs enough space, suitable structural support, practical pipe routes and a safe discharge arrangement. We assess these points and discuss the temporary hot-water interruption before installation.

