A wet room built from the base up
Falls formed correctly
We shape the shower area so that water is directed towards the drain.
Waterproofing before finishes
We prepare the background instead of relying on grout or sealant alone.
Access considered early
We plan thresholds, screens and usable space before the room is fitted.
Water control starts below the visible finish
A wet room needs more than a smart shower and a tiled floor. We assess the floor construction, drain position, room shape and ventilation before planning the build-up. Correct falls must carry water towards the drain, while the prepared floor and walls need a suitable water-resistant system beneath the final finish. We can include a level or low threshold, screen, niche, seating or grab rails where the layout allows. Slip-resistant surface choices also matter in a room designed for open showering.


Choose open access or better splash control
A fully open wet room can improve access and make good use of a suitable space, but smaller rooms may benefit from a screen or contained walk-in arrangement. We discuss splash spread, doorway position and nearby fittings before settling the layout. Work then moves through strip-out, substrate preparation, plumbing, waterproofing and the chosen wall and floor finish. We seal and test the completed room, with plumbing, tiling and shower boards coordinated through the same team.
Frequently asked questions
Does a wet room have to be completely open?
No. A screen or more contained walk-in layout can limit splash while keeping access straightforward. We consider room size, drainage and nearby fittings before recommending how open the shower area should be.
Can any bathroom become a wet room?
Many can, but floor construction, drainage routes, room level and ventilation need checking. We assess how suitable falls and waterproofing can be formed without creating problems at the doorway or adjoining rooms.
Are tiles enough to waterproof the room?
Tiles and grout are the visible finish, not the complete waterproofing system. We prepare the substrate and install a suitable water-resistant build-up before fitting and sealing the chosen surfaces.

